Economical On The Construction Site

- Aug 29, 2017 -

Economical on the construction site


The more welding and pickling is already performed on GLEN’s premises instead of on

the construction site, the greater the potential savings that can be achieved – while at the

same time reducing environ- mental damage on the installation site.

Welding on GLEN‘s premises also improves the quality of the weld seams and the surface

quality. The maintenance, repair and downtime costs of your system are reduced.

In short: using prefabricated piping components reduces the amount of welding and also

the radioscopy required on your construction site. We offer you spools ready for

installation including final documentation.

This saves your on-site resources:

•Reduces staff

•Cuts installation time

•Requires less space

blob.png

Related News

Related Products

  • Duplex Steel 2205/2507/31803stainless Steel Tube Fittings, Butt Welding Elbow Seamless or Weld 45/90/180 Deg. Short/long Radius, ABS Certificated
  • Large Size Concentrate Welding Reducer
  • ASTM ASME Stainless Steel Pipe Flanges and Fittings
  • SABS / SANS 1123 T1000, T1600, T2500, T4000 HDPE Galvinised Flanges and Backing Ring Flange
  • ANSI B16.5 Class 150 Duplex Steel Socket Weld Pipe Flanges, ASME A182 F51 Flanges
  • ANSI B16.5 Class 150 Slip-On Flanges for Shipbuilding and Marine Industry with DNV Certificated